Gulf Coast Paint

Epoxy Coatings

POLY-CHEMCURE PC-651 HEAVY-DUTY ZERO VOC NON-SKID COATING

PC-651 is a two-component heavy duty non-skid epoxy coating.  PC-651 is designed as a heavy-duty non-skid coating for industrial and marine applications.  PC-651 helps to provide slip resistance in wet and slippery conditions.  Ideal for both new and old concrete surfaces, interior and exterior surfaces.  PC-651 is also designed for application on concrete and steel surfaces.

Send Inquiry
SKU PC-651 Category

PRODUCT USES

Excellent as a non-skid for trailers, car haulers, tow trucks, warehouse floors, aisle-ways, parking decks, platforms, concrete slabs, bridges, loading docks, ramps, exterior walks, steps, production areas, garages, Seafood processing areas, canneries, meat packing plants, bottlers, poultry plants, chemical plants, paper mills, ships, work boats, barges, offshore platforms, ship docks, oil refineries, water treatment plants, breweries, ramps, floors, steps and wash down areas.

PRODUCT FEATURES

Zero V.O.C.

Good abrasion and impact

Heavy duty non-skid resistance

Ready to use non-skid coating

Provides excellent slip resistance

Easy to apply

Good water, salt and chemical resistance

Designed for wet areas

Excellent coating for Diamond Plate

Mil PRF 24667B product offset

Available in low temperature cure and fast cure

 

Details

COLORS

182 Dark Gray, 231 Light Gray, Safety Yellow, Black (Other colors available on Special Order)

FINISH

Gloss

VOLUME SOLIDS

91 ± 2%

V.O.C.

0 GMS/L

COVERAGE (Theoretical)

Phenolic Core Roller – approximately 30-40 sq. ft. per gal. Trowel, squeegee – approximately 40-50 sq. ft. per gal. (coverage varies due to surface porosity and desired degree of non-skid)

PACKAGING

1 gal. and 5 gal. Kits (special order only)

MIXING RATIO

4:1 by volume. Mix 4 parts Base (Part A) to 1 part Hardener (Part B)

APPLICATION

4:1 by volume. Mix 4 parts Base (Part A) to 1 part Hardener (Part B)

POT LIFE

@ 75ºF: 1-1/2 hours (Regular Cure); 1 hour (Low Temp. Cure)

APPLICATION TEMPERATURE

50-120ºF (Regular Cure); 40-100°F (Low Temp Cure)

CURE TIME

@ 75ºF: 8 hours (Regular Cure); 6 hours (Low Temp. Cure)

DRY SERVICE TEMPERATURE

160°F

THINNING

5-10% with SA-65, if necessary

CLEAN UP

SA-17 or S-74

SHELF LIFE

Minimum 12 months